Complete property refurbishment
Leatherhead, Surrey · Full residential refurbishment · 6-week programme
Complete property refurbishment
The brief
The property required a complete refurbishment before returning to the rental market. What began as a planned renewal of the kitchen, bathroom and interior finishes developed into a more extensive renovation as the existing building was opened up.
Our aim was to address the underlying issues properly before putting the property back together, while keeping the project moving within a six-week programme.
Opening up the property
The existing kitchen and bathroom were completely stripped out, along with the old floor coverings and finishes throughout.
During the works, cracks were discovered beneath wallpaper covering the original lath and plaster ceilings upstairs. Rather than simply covering the problem, the affected ceilings were taken down and renewed.
Further investigation revealed that a number of the internal stud walls were significantly out of level. These were straightened before the new finishes were installed, giving us a sound and accurate base for the remainder of the refurbishment.
Addressing damp and ventilation
Areas of mould were also identified on the external walls. With no cavity within the existing wall construction, sections of affected plaster were removed as part of the remedial works.
A positive input ventilation (PIV) system was installed to improve air circulation and help manage moisture levels within the property.
Putting it back together
Once the underlying issues had been addressed, the property could be rebuilt and finished.
The works included new electrical and plumbing installations, a new kitchen and bathroom, bathroom tiling, flooring and carpets, plastering, decoration and final finishing throughout.
Managing the complete refurbishment allowed us to coordinate each stage of the work and maintain progress despite the additional issues uncovered during the project.
The result
Within six weeks, the property had been taken from a tired interior with a number of concealed defects to a completely refurbished home ready to return to the rental market.
More importantly, the work went beyond the visible finishes. The problems uncovered during the refurbishment were addressed before the property was put back together, leaving the client with a home that had been improved both visually and practically.